Located in a semi-arid zone, the Provinces and Khouribga and Khemisset are experiencing a deficiency in water resources and an inadequate development of the infrastructure. Khouribga and Khemisset will have population of about 1.5 million inhabitants by 2015 for a connection ratio of about 89 to 96% in urban areas and only 5 to 20% in rural areas.

The current project contributes to an improvement of the water supply situation in the concerned provinces by providing treated surface water from two impounding reservoirs via long-distance pipelines. The total project budget is : 15,487,000,000 JPY = 116.000.000 Euro

Sub-project 1: Central Morocco region

The Khouribga subproject supplies towns and rural communities in central Morocco (1.2 million inhabitants concerned). Investment measures include:

  • Raw water pumping station at the impounding reservoir
  • Raw water pipeline from dam to water treatment plant
  • Water treatment plant (WTP) for producing treated water for 1.2 million inhabitants
  • Water transfer pipeline from water treatment plant to Khouribga stretching over 73 km, in-cluding several pumping stations and service reservoirs for supplying smaller locations
  • Remote control system for managing the whole system
Sub-project 2: Khemisset-Miflet region

The Khemisset-Miflet subproject supplies the towns of Khemisset and Miflet, and several small-er urban and rural municipalities (420,000 inhabitants concerned). Investment measures include:

  • Water treatment plant (WTP) for producing treated water for 0.42 million inhabitants
  • Water transfer pipeline from water treatment plant to the towns stretching over 30 km, in-cluding several pumping stations and service reservoirs for supplying smaller locations
  • T Remote control system for managing the whole system

Services Provided

Assignment 1: Preconstruction
  • Verification of the tender documents for works packages that have not yet been tendered
  • Preparation of briefing notes for the project
  • The awarding of contracts
Assignment 2: Execution of the works
  • Preparation of the project management handbook
  • Verification of the conditions for performing the works
  • Verification of the schedule and the contractors’ human and material resources
  • Adaptation of the construction programme to the specifics of the site
  • Review and approval of the site installation plans
  • General supervision of the works
  • Qualitative and quantitative control
  • Technical and financial review of the contractor’s proposals and recommendations to ONEP for appropriate solutions
  • Monitoring and control of the construction programme
  • Environmental monitoring of the works
  • Commissioning of the structures, provisional acceptance and as-built drawings
For the 2 assignments, IGIP provided the following services:
  • Coordination assistance between JICA, ONEP, the public utilities, and the municipal services
  • Preparation of cash-outflow forecasts, expenditure statements, and account monitoring
  • Preparation of activity reports with monitoring indicators
  • Project completion report